INTERNATIONAL & DOMESTIC CLIENTS PROJECTS

S.NO PROJECT NAME ITEM DESCRIPTION CLIENT 
1 Pagbilao 420 MW Unit 3 CfPP 2 * 230kV Switchyard / Circuit Breaker DAELIM
2 Umm Wu`al EPC Project Ammonia Plant Instrument Junction Box (1 LOT) DAELIM
3 MALAYSIA TNB FAST TRACK 3A PROJECT Support Steel Structure for 500kV Air Insulated Switchgear (AIS) DAELIM
4 Malaysia TNB Fast Track 3A Project – 1×1000 MW Coal Fired Power Plant HV Cable Termination Kit DAELIM
5 MALAYSIA TNB FAST TRACK 3A PROJECT 500kV Transmission Line System – Galvanized Steel Lattice Tower (45ST Series) DAELIM
6 MALAYSIA TNB FAST TRACK 3A PROJECT Transmission Line for 500kV Air Insulated Switch Gear (AIS) DAELIM
7 MALAYSIA TNB FAST TRACK 3A PROJECT Power and control cables DAELIM
8 MALAYSIA TNB FAST TRACK 3A PROJECT Instrument Cable for Boiler DAELIM
9 MALAYSIA TNB FAST TRACK 3A PROJECT Substation Control System of 500K AIS DAELIM
10 MALAYSIA TNB FAST TRACK 3A PROJECT Interconnection Facilities for 500kV Air Insulated Switchgear (AIS) DAELIM
11 Malaysia TNB Fast Track 3A Project Cables, Cable Tray & Electric Installation Material DAELIM
12 Malaysia TNB Fast Track 3A Project Instrument Fiber Optic Cable / 10,900m DAELIM
13 SM200 – 200MW Coal-Fired Station Project TKKT-13017R1-HJ (FST4000 DISPLACEMENT LEVEL SWITCH) DAELIM
14 Ma'aden Ammonia Project Natural Gas Electric Heater DAELIM
15 SINGAPORE LNG TERMINAL -
PHASE 3 EXPANSION
LV SWITCHGEAR Samsung  C & T 
16 RGT-2 TERMINAL PROJECT 11KV AIS SWITCHGEAR Samsung  C & T 
17 Kirikkale Independent Power Project(KIPP) PLC Software Samsung  C & T 
18 330 MW POWER STATION CAN CANAKKALE                                         Turkey Electric Motors Samsung  C & T 
19 ORPIC -EPC PETCOKE HANDLING & STORAGE FACILITY Electric Vaccum Cleaners LARSEN & TOUBRO(OMAN) LLC
20 SAFCO IV Ammonia Plant 16kV Switchgear 16kV Switchgear e TEC E & C
21 LAOS GMS Nothern Power Transmission 400/230VAC Switch board HYUNDAI Engineering & Constructions
22 RGT-2 Terminal project LV Cable Samsung C & T
23 Umm Al Houl  Power IWPP Project Medium Voltage Cables & Low Voltage cables Samsung C & T
24 Rapid Package No 6A LLDPE Package LV Cable-2C+E x 4mm2, LV CABLE-3C x 4 mm2, LV CABLE-3C x10mm2, LV CABLE-3C x25mm2,  LV CABLE-3C x35mm2, Samsung Engineering
25 LAOS GMS Nothern Power Transmission 400/230VAC Switch board/1Unit Hyundai Engineering
26 SLNG MMS System Cabinet Samsung Engineering
27 LAOS GMS Nothern Power Trasmission KV SWTCHYARD Equipments HEC(Hyundai Engineering)
28 QCLNG UPSTREAM PROJECTS  Honeywell ,RTU Enclosure,PWR Enclosures,Cables HEC(Hyundai Engineering)
29 GMS Northern Power transmission Project 115KV Switch yard Equipments,Power transformers, Hyundai
30 Umm Al Houl Power IWPP Project LVAC/DC Switch Board,HVAC Package unit Samsung C & T
31 RTG-2 Terminal Project LV Distribution Board Samsung C & T
32 SLNG PH3 MMS System Cabinet Samsung C & T
33 Satah Al Razboot(SARB) Distribute board Panel Hyundai Engineering and Construction
34 Lordegan Urea Fertilizer Project Electrical  Cabinet Hyosung Good Springs
35 Karbala Project Field Bus,Power,Fiber Optic ,Instrument Cables,Pumps and Spares Samsung C & T
36 Algeria- CCPP Project Isolated Phase Bes Duct. Samsung C & T
37 UMM Al Houl Power IWPP Project LVAC Switcher Gear  Samsung C & T
38 South Helwan Super Critical Power Plant 3x 650 MW Units MCC Panel Techint Engineering & Construction
39 26 MW Power Plant, Orissa Cables ,  Control Panel, Bus Duct, Thermo Stats M/s  Tata sponge Iron Ltd. Joda. Orissa.
40 Kearl Oil Sands Project
CDA Hypogene Project, Chile
72.5 KV Cricuit breaker
Transformer 220KV/13.8KV.
M/s AMEC Kearl Oil & Sands & AMEC International Chile SA
41 Laja Mill Modernization  Project Transformer M/s CMPC Cellulosa  S.A., Chile
42 Desalination Plant 50V, 50A rated Transformer Rectifier Units, Control Panels, M/s SWCC – Riyadh, K.S.A
43 26 MW Power Plant - 220 KV Power Transmission Line  Generator, HV, LV Cables,
Spark arrester
M/s Tata sponge Iron Ltd. Joda. Orissa. Sithapuram power Ltd,.
44 SADARA  Isocyanates Plant Project Integrated Process Control Systems








M/s Daelim, Korea
KNPC LPG Train 4  
Project
LV 400V, 1200A Bus duct NSPBD (50 KA)
Control panel
Petron Bataan Refinery Master Plan (RMP-2) Network security access control system
SADARA mixed feed cracker project Electric Pressure Transmitters,
Vibration Monitoring
Saudi Elastomers Project Machine Monitoring System (MMS)
Safety Instrumented System (SIS)
JG Summit Naphtha Cracker Project Multiplexer With Junction Box
Coriolis  Flow Meters And Transmitters
KNPC LPG Train 4 Project Analyzers For Process
Annunciator Panels
Vortex Flow Meters
Petron RMP 2 Ultrasonic Flow Meters
YERP EPC-4 Project Batteries
45 South Pars Gas Field Development Phase 19 Pressure Transmitter, Differential Pressure Transmitter(Flow) / (Level), Hand  Held Communicator, 5 Way  Manifold Valve, 2 Way  Manifold Valve.
Long Radius Flow Nozzle Assembly , Steam And Water Analysis System (Wet Rack) Panel, Pressure Regulator Valve &
Motor Operated Control Valves
Petro Pars,  Iran

 

Our Clients

  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #